2022 Sportsman 352

2022 Sportsman 352 "Change Order"

PRICE $275,000
LOCATION West Palm Beach , Florida, US
Specification Background dark gradient

Description

This 2022 Sportsman 352, "Change Order," is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425 outboards with digital electric steering and low hours under 300, backed by an extended engine warranty. Built for serious performance and all-day comfort, she blends innovative technology, high-end finishes, and genuine fishability. At the helm, dual Garmin GPSMAP 8622 22" displays, a Yamaha Command Link Plus CL7 touchscreen, and SeaStar Maximus digital switching pair with an Edson stainless steel steering wheel and a JL Audio M6 sound system with 12 speakers. Anglers will appreciate dual 30-gallon pressurized aquarium livewells, macerated in-deck fish boxes, six flush-mounted gunwale rod holders, and a high-speed livewell pickup and sea chest. Comfort runs just as deep, with triple premium captain's chairs, a rear-facing seat with sink, an electric-actuated bow table and sun deck, and a console berth with sleeping for two adults plus a child, complete with sink, shower, and porcelain head. Built on SportTech vacuum-infusion hull construction backed by a 10-year hull warranty, this 35-foot center console is turnkey and ready for anything — whether you're heading offshore or entertaining at the sandbar.

Jefferson Beach Yacht Sales is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel
Read More More
Read Less Less

Specifications

Basic Information

  • Builder Sportsman
  • Model 352
  • Category Center Consoles
  • Type Power
  • Year 2022

Dimensions & Weight

  • LOA 35' 2"
  • Beam 11' 2"
  • Max Draft 2'
  • Dry Weight 9,850 LBS

Standard Engine

  • Make Yamaha
  • Model XF425NSA2
  • Type Outboard
  • Year 2022
  • Hours 250
  • Location Port
  • Engine Power 425 HP
  • Fuel Type Gas/Petrol

Tank Capacities

  • Fuel Tank 330 GAL
  • Fresh Water 35 GAL

Hull & Performance

  • Fuel Type Gas/Petrol
  • Cruise Speed 37.8 KTS

Accommodations

  • Heads 1

inquire about this
2022 Sportsman 35 " Change Order"

LATEST NEWS & EVENTS

Slider Arrow
Slider Arrow